Rocky Mountain Project - Technical Proposal for a Cultural Management Effects Mitigation, Rocky Mountain Pumped Storage Generating Station, Floyd County, Georgia and Amendment: Review and Secondary Inquiry
Year: 1983
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Rocky Mountain Project - Technical Proposal for a Cultural Management Effects Mitigation, Rocky Mountain Pumped Storage Generating Station, Floyd County, Georgia and Amendment: Review and Secondary Inquiry. 1983 ( tDAR id: 148203)
Keywords
Material
Chipped Stone
General
Agriculture Methods
•
Behavioral Patterns
•
Cultural Resources Management Plan
•
Economic Trends
•
Lithic Tools
•
Management
•
Oral History
•
Proposal
•
Settlement patterns
Geographic Keywords
13115 (Fips Code)
•
Floyd (County)
•
Georgia (State / Territory)
•
North America (Continent)
•
Rome
•
United States of America (Country)
Temporal Coverage
Calendar Date: 1840 to 1930
Spatial Coverage
min long: -85.462; min lat: 34.079 ; max long: -85.005; max lat: 34.587 ;
Individual & Institutional Roles
Sponsor(s): Georgia Power Company, Atlanta, Ga 30302
Prepared By(s): Resource Analysts, Inc., Bloomington, Indiana 47402
Record Identifiers
NADB document id number(s): 550572
NADB citation id number(s): 000000068057
Notes
General Note: Contract number: FERC #2725
General Note: Sent from: Resource Analysts, Inc., Bloomington, Indiana 47402
General Note: Submitted to: Georgia Power Company, Atlanta, Ga 30302