Phase I and II Investigations of the Cincinnati Gas & Electric Company's Proposed Deerfield Substation and Associated 138Kv Electric Transmission Line, Clermont County, Ohio
Author(s): Kenneth E. Jackson; Elisabeth H. Tuttle
Year: 1992
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I and II Investigations of the Cincinnati Gas & Electric Company's Proposed Deerfield Substation and Associated 138Kv Electric Transmission Line, Clermont County, Ohio. Kenneth E. Jackson, Elisabeth H. Tuttle. 1992 ( tDAR id: 14912)
Keywords
Geographic Keywords
39025 (Fips Code)
•
Clermont (County)
•
Goshen Township
•
Miami Township
•
North America (Continent)
•
Ohio (State / Territory)
•
Stonelick Township
•
United States of America (Country)
Spatial Coverage
min long: -84.32; min lat: 38.77 ; max long: -83.99; max lat: 39.271 ;
Individual & Institutional Roles
Sponsor(s): Cincinnati Gas & Electric Company
Prepared By(s): Gray & Pape, Inc.
Record Identifiers
NADB document id number(s): 31780
NADB citation id number(s): 000000145378
Notes
General Note: Submitted to: Cincinnati Gas & Electric Company
General Note: Sent from: Gray & Pape, Inc.