Archaeological Impact Assessment of the Construction of the New Vienna Wastewater Treatment Plant and Influent Line, New Vienna Green Township, Clinton County, Ohio
Author(s): Claude F. White
Year: 1979
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Archaeological Impact Assessment of the Construction of the New Vienna Wastewater Treatment Plant and Influent Line, New Vienna Green Township, Clinton County, Ohio. Claude F. White. 1979 ( tDAR id: 15027)
Keywords
General
Impact Assessment
Geographic Keywords
39027 (Fips Code)
•
Clinton (County)
•
New Vienna
•
North America (Continent)
•
Ohio (State / Territory)
•
United States of America (Country)
Spatial Coverage
min long: -84.007; min lat: 39.223 ; max long: -83.576; max lat: 39.569 ;
Individual & Institutional Roles
Sponsor(s): W. E. Gates and Associates, Inc.
Prepared By(s): Claude F. White and Associates
Record Identifiers
NADB document id number(s): 31809
NADB citation id number(s): 000000145407
Notes
General Note: Sent from: Claude F. White and Associates
General Note: Submitted to: W. E. Gates and Associates, Inc.