Cultural Resources Clearance of Drill Sites, and the Spillway at Fruit Growers Reservoir, Fruit Growers Dam Project, Delta County, Colorado, Gjpo-82-7
Author(s): Peggy Barnett
Year: 1982
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resources Clearance of Drill Sites, and the Spillway at Fruit Growers Reservoir, Fruit Growers Dam Project, Delta County, Colorado, Gjpo-82-7. Peggy Barnett. 1982 ( tDAR id: 156976)
Keywords
Investigation Types
Site Evaluation / Testing
General
Cultural Resource
•
Dam
•
Field Reconnaisance--Sampling
•
Fruit Growers Dam
•
Significance / Management
Geographic Keywords
08029 (Fips Code)
•
Colorado (State / Territory)
•
Delta (County)
•
Gunnison River
•
North America (Continent)
•
Uncompahgre River
•
United States of America (Country)
Temporal Coverage
Calendar Date: 1925 to 1949
Spatial Coverage
min long: -108.379; min lat: 38.667 ; max long: -107.501; max lat: 39.218 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Reclamation; Burec Plan. Div., Upper Colorado Reg., Salt Lake City, UT
Prepared By(s): Burec, Grand Junction Projects Office, Grand Junction, Co
Record Identifiers
NADB document id number(s): 600341
NADB citation id number(s): 000000090815
Notes
General Note: Submitted to: Burec Plan. Div., Upper Colorado Reg., Salt Lake City, UT
General Note: Sent from: Burec, Grand Junction Projects Office, Grand Junction, CO