Housing Authority of Malheur County, Nyssa Labor Camp, Proposed New Construction Project
Author(s): James P. Green
Year: 1979
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Housing Authority of Malheur County, Nyssa Labor Camp, Proposed New Construction Project. James P. Green. 1979 ( tDAR id: 158640)
Keywords
Investigation Types
Site Evaluation / Testing
Geographic Keywords
41025 (Fips Code)
•
Harney (County)
•
North America (Continent)
•
Nyssa
•
Oregon (State / Territory)
•
Southeast Oregon
•
United States of America (Country)
Spatial Coverage
min long: -119.944; min lat: 41.992 ; max long: -118.195; max lat: 44.048 ;
Individual & Institutional Roles
Sponsor(s): Aero-Geometrics Inc., Ontario, or
Prepared By(s): James P. Green, Boise, or
Record Identifiers
NADB document id number(s): 1294923
NADB citation id number(s): 000000034874
Notes
General Note: Submitted to: Aero-Geometrics Inc., Ontario, or
General Note: Sent from: James P. Green, Boise, or