Jamba Site Mitigation - Phase I Norwich Wastewater Treatment Plant Site Norwich, New York
Author(s): Daniel F. Cassedy
Year: 1985
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Jamba Site Mitigation - Phase I Norwich Wastewater Treatment Plant Site Norwich, New York. Daniel F. Cassedy. 1985 ( tDAR id: 162437)
Keywords
General
Archeological Overview / Synthesis-Project Spec
•
Field Reconnaisance--Sampling
•
Lithic Scatter
•
Mitigation
•
Proposed Construction Project
•
Site Settlement
•
Vinette I Pottery
Geographic Keywords
36017 (Fips Code)
•
Chenango (County)
•
New York (State / Territory)
•
North America (Continent)
•
Norwich
•
United States of America (Country)
Spatial Coverage
min long: -75.89; min lat: 42.195 ; max long: -75.293; max lat: 42.745 ;
Individual & Institutional Roles
Sponsor(s): O'Brien & Gere Engineers, Inc. Buckley Rd. Syracuse, N.Y.
Prepared By(s): Public Archaeology Facility Dept. of Anthro. SUNY Binghamton
Record Identifiers
NADB document id number(s): 8976
NADB citation id number(s): 000000084785
Notes
General Note: Sent from: Public Archaeology Facility Dept. of Anthro. SUNY Binghamton
General Note: Submitted to: O'Brien & Gere Engineers, Inc. Buckley Rd. Syracuse, N.Y.