Gallipolis Locks and Dam Replacement, Ohio River Phase 1, Advanced Engineering and Design Study. General Design Memorandum: Appendix H, Social and Cultural Resources

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Gallipolis Locks and Dam Replacement, Ohio River Phase 1, Advanced Engineering and Design Study. General Design Memorandum: Appendix H, Social and Cultural Resources. U. S. Army Corps of Engineers, Huntington District. 1980 ( tDAR id: 163593)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -82.222; min lat: 38.475 ; max long: -81.773; max lat: 39.03 ;

Individual & Institutional Roles

Prepared By(s): U. S. Army Corps of Engineers, Huntington District, WV

Record Identifiers

NADB document id number(s): 14105

NADB citation id number(s): 000000088699

Notes

General Note: Sent from: U. S. Army Corps of Engineers, Huntington District, WV