Phase I and Phase II Archeological Investigations of the Proposed Expansion of an Ash Disposal Pond Near the Possum Point Power Station, Prince William County, Virginia

Author(s): Joseph Balicki

Year: 1986

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I and Phase II Archeological Investigations of the Proposed Expansion of an Ash Disposal Pond Near the Possum Point Power Station, Prince William County, Virginia. Joseph Balicki. 1986 ( tDAR id: 163834)

This Resource is Part of the Following Collections

Temporal Coverage

Calendar Date: 1750 to 1799

Spatial Coverage

min long: -77.716; min lat: 38.501 ; max long: -77.219; max lat: 38.943 ;

Individual & Institutional Roles

Sponsor(s): VA Power Co.

Prepared By(s): Thunderbird Archeological Associates

Record Identifiers

NADB document id number(s): 13764

NADB citation id number(s): 000000088359

Notes

General Note: Submitted to: VA Power Co.

General Note: Sent from: Thunderbird Archeological Associates