Segment 11, Point III, Boulevard Corridor Study for the Interstate Highway System in the City of Baltimore

Author(s): Urban Design Concept Associates

Year: 1970

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Segment 11, Point III, Boulevard Corridor Study for the Interstate Highway System in the City of Baltimore. Urban Design Concept Associates. 1970 ( tDAR id: 166153)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -76.896; min lat: 39.157 ; max long: -76.288; max lat: 39.721 ;

Individual & Institutional Roles

Sponsor(s): Interstate Division for Baltimore City

Prepared By(s): Urban Design Concept Associates

Record Identifiers

NADB document id number(s): 3616

NADB citation id number(s): 000000080524

Notes

General Note: Sent from: Urban Design Concept Associates

General Note: Submitted to: Interstate Division for Baltimore City