Feasibility Study: Renovation of Bayou Hotel
Author(s): Mark Beck Associates, Inc.
Year: 1979
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Feasibility Study: Renovation of Bayou Hotel. Mark Beck Associates, Inc.. 1979 ( tDAR id: 166214)
Keywords
General
Architecture
•
Significance / Management
•
Special Historic Architecture Study
Geographic Keywords
24025 (Fips Code)
•
Harford (County)
•
Havre DE Grace
•
Maryland (State / Territory)
•
North America (Continent)
•
United States of America (Country)
Temporal Keywords
Historic
Temporal Coverage
Calendar Date: 1900 to 1924
Spatial Coverage
min long: -76.569; min lat: 39.254 ; max long: -76.036; max lat: 39.722 ;
Individual & Institutional Roles
Sponsor(s): City of Havre DE Grace
Prepared By(s): Mark Beck Assoc. , Inc. , Towson, MD
Record Identifiers
NADB document id number(s): 3533
NADB citation id number(s): 000000080441
Notes
General Note: Submitted to: City of Havre DE Grace
General Note: Sent from: Mark Beck Assoc., Inc., Towson, MD