Locational ("Phase II") Survey of the Proposed Ross-Waverly 138Kv Transmission Line Relocation Corridor, Springfield Township, Ross County, Ohio
Author(s): Wesley S. Clarke; John Stewart
Year: 1980
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Locational ("Phase II") Survey of the Proposed Ross-Waverly 138Kv Transmission Line Relocation Corridor, Springfield Township, Ross County, Ohio. Wesley S. Clarke, John Stewart. 1980 ( tDAR id: 16751)
Keywords
Culture
Early Woodland
•
Late Archaic
Material
Ground Stone
General
33 RO 269
•
74001615 / Great Seal State Park Archaeological
•
74001615 / Great Seal State Park Archeological
•
Historic Fence Rows
•
Parke-Pike Soils
•
Prehistory
•
Project
•
Scatters
•
Transmission Line
•
Upper Mercer Flint
Geographic Keywords
39141 (Fips Code)
•
North America (Continent)
•
Ohio (State / Territory)
•
Ross (County)
•
Scioto River Drainage
•
Springfield Township
•
United States of America (Country)
Temporal Keywords
Historic
Spatial Coverage
min long: -83.394; min lat: 39.168 ; max long: -82.741; max lat: 39.516 ;
Individual & Institutional Roles
Sponsor(s): Columbus & Southern Ohio Electric Company, Columbus, OH
Prepared By(s): Wesley S. Clarke
Record Identifiers
NADB document id number(s): 30310
NADB citation id number(s): 000000143917
Notes
General Note: Submitted to: Columbus & Southern Ohio Electric Company, Columbus, OH
General Note: Sent from: Wesley S. Clarke