Cultural Resources Survey of Proposed Alternate A, U.S. 45, Between Tupelo and Saltillo, Lee County (77-0002-05-003-10), (79-0002-05-019-12)

Author(s): Mississippi State Highway Department

Year: 1976

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Cultural Resources Survey of Proposed Alternate A, U.S. 45, Between Tupelo and Saltillo, Lee County (77-0002-05-003-10), (79-0002-05-019-12). Mississippi State Highway Department. 1976 ( tDAR id: 173063)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -88.826; min lat: 34.075 ; max long: -88.542; max lat: 34.509 ;

Individual & Institutional Roles

Sponsor(s): State, County, and Local Government; Mississippi State Highway Department, Jackson, MS

Prepared By(s): Mississippi State Highway Department

Record Identifiers

NADB document id number(s): 400820

NADB citation id number(s): 000000062155

Notes

General Note: Sent from: Mississippi State Highway Department

General Note: Submitted to: Mississippi State Highway Department, Jackson, MS