Cultural Resources Survey of Proposed Realignment of U.S. Highway 78 from the East End of the Holly Springs Bypass To the Benton County Line (Mshd Project No. 98-0006-01-047-10), Marshall County, Mississippi
Author(s): Robert D. Hyatt
Year: 1986
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resources Survey of Proposed Realignment of U.S. Highway 78 from the East End of the Holly Springs Bypass To the Benton County Line (Mshd Project No. 98-0006-01-047-10), Marshall County, Mississippi. Robert D. Hyatt. 1986 ( tDAR id: 173113)
Keywords
Investigation Types
Archaeological Overview
General
Cultural Resource
Spatial Coverage
min long: -89.724; min lat: 34.495 ; max long: -89.246; max lat: 34.995 ;
Individual & Institutional Roles
Sponsor(s): State, County, and Local Government; Mississippi State Highway Department, Jackson, MS
Prepared By(s): Mississippi State Highway Department
Record Identifiers
NADB document id number(s): 400938
NADB citation id number(s): 000000062273
Notes
General Note: Submitted to: Mississippi State Highway Department, Jackson, MS
General Note: Sent from: Mississippi State Highway Department