Cultural Resource Assessment of the Metro Loop, Talbot-O'Brien 115 Kv Power Line at the Renton Treatment Plant, King County, Washington
Author(s): Valentina A. Cavazos
Year: 1985
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resource Assessment of the Metro Loop, Talbot-O'Brien 115 Kv Power Line at the Renton Treatment Plant, King County, Washington. Valentina A. Cavazos. 1985 ( tDAR id: 187076)
Keywords
Investigation Types
Archaeological Overview
General
Cultural Resource
•
Power Line
•
Significance / Management
Geographic Keywords
53033 (Fips Code)
•
King (County)
•
North America (Continent)
•
Renton
•
Southern Puget Sound Unit
•
United States of America (Country)
•
Washington (State / Territory)
Spatial Coverage
min long: -122.541; min lat: 47.084 ; max long: -121.066; max lat: 47.78 ;
Individual & Institutional Roles
Sponsor(s): Puget Sound Power and Light Co., Bellevue, WA
Prepared By(s): Office of Public Archaeology, University of Washington
Record Identifiers
NADB document id number(s): 1330265
NADB citation id number(s): 000000038845
Notes
General Note: Sent from: Office of Public Archaeology, University of Washington
General Note: Submitted to: Puget Sound Power and Light Co., Bellevue, WA