Final Archeological Impact Evaluation Stage One Survey Saratoga County Sewer District Phase 5 Project Sub-Areas
Author(s): Gary Berg
Year: 1977
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Final Archeological Impact Evaluation Stage One Survey Saratoga County Sewer District Phase 5 Project Sub-Areas. Gary Berg. 1977 ( tDAR id: 192176)
Keywords
Material
Chipped Stone
Investigation Types
Site Evaluation / Testing
General
Archeological Overview / Synthesis-Project Spec
•
Evaluation
•
Field Reconnaisance--Sampling
•
Lithic Debitage
•
Prehistory
•
Proposed Construction
•
Sewer
•
Site Settlement
Geographic Keywords
36091 (Fips Code)
•
Clifton Park
•
Loughberry Lake
•
New York (State / Territory)
•
North America (Continent)
•
Saratoga (County)
•
United States of America (Country)
Temporal Keywords
Historic
Spatial Coverage
min long: -74.16; min lat: 42.775 ; max long: -73.573; max lat: 43.398 ;
Individual & Institutional Roles
Sponsor(s): Malcolm Pirnie, Inc. Consulting Environmental Engineers
Prepared By(s): Gary Berg
Record Identifiers
NADB document id number(s): 9293
NADB citation id number(s): 000000085100
Notes
General Note: Sent from: Gary Berg
General Note: Contract number: 24, 25, 26, 27, 28, 29
General Note: Submitted to: Malcolm Pirnie, Inc. Consulting Environmental Engineers