Archaeological Clearance of Project Ir 025-2(180), Harrison Road Interchange (State Highway 29) - South, El Paso County
Author(s): Barbara Chocol; Debra Angulski
Year: 1985
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Archaeological Clearance of Project Ir 025-2(180), Harrison Road Interchange (State Highway 29) - South, El Paso County. Barbara Chocol, Debra Angulski. 1985 ( tDAR id: 194328)
Keywords
Investigation Types
Archaeological Overview
•
Site Evaluation / Testing
General
Archaeological Clearance
•
Archeological Clearance
•
Field Reconnaisance--Intensive
•
No Cultural Resources
•
Significance / Management
Spatial Coverage
min long: -105.073; min lat: 38.519 ; max long: -104.052; max lat: 39.13 ;
Individual & Institutional Roles
Sponsor(s): Engineering District 2, Colo. Dept. of Highways, Pueblo, Co
Prepared By(s): Colorado Department of Highways, Denver, CO
Record Identifiers
NADB document id number(s): 603372
NADB citation id number(s): 000000093775
Notes
General Note: Submitted to: Engineering District 2, Colo. Dept. of Highways, Pueblo, Co
General Note: Sent from: Colorado Department of Highways, Denver, CO