Cultural Resources Survey of the Proposed Central Louisiana Electric Company's Transmission Corridor; Dolet Hills Power Plant To the Fisher Substation, De Soto and Sabine Parishes, Louisiana

Author(s): G. R. Dennis Price; Michael R. Madden

Year: 1984

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Cultural Resources Survey of the Proposed Central Louisiana Electric Company's Transmission Corridor; Dolet Hills Power Plant To the Fisher Substation, De Soto and Sabine Parishes, Louisiana. G. R. Dennis Price, Michael R. Madden. 1984 ( tDAR id: 195295)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -94.043; min lat: 31.166 ; max long: -93.236; max lat: 32.346 ;

Individual & Institutional Roles

Sponsor(s): Central Louisiana Electric Company

Prepared By(s): Heartfield, Price and Greene, inc

Record Identifiers

NADB document id number(s): 4100976

NADB citation id number(s): 000000077970

Notes

General Note: Sent from: Heartfield, Price and Greene, Inc

General Note: Submitted to: Central Louisiana Electric Company