Department of Army Permit Application No. 14815(02), Bullet Concrete Materials, Inc., Applicant, For an Extension of Time To Complete Dredging and Bulkheading of a Permit Area On the Gulf Intracoastal Waterway (GIWW), San Patricio County
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Department of Army Permit Application No. 14815(02), Bullet Concrete Materials, Inc., Applicant, For an Extension of Time To Complete Dredging and Bulkheading of a Permit Area On the Gulf Intracoastal Waterway (GIWW), San Patricio County. J. Stokes, C. Good. 1985 ( tDAR id: 24313)
Keywords
Investigation Types
Archaeological Overview
General
85 / 04 / 22
•
Corps of Engineers
•
No Sites
Geographic Keywords
48409 (Fips Code)
•
North America (Continent)
•
San Patricio (County)
•
Texas (State / Territory)
•
United States of America (Country)
Spatial Coverage
min long: -97.909; min lat: 27.821 ; max long: -97.135; max lat: 28.179 ;
Individual & Institutional Roles
Sponsor(s): Army Corps of Engineers
Record Identifiers
NADB document id number(s): 844339
NADB citation id number(s): 000000131302