Phase I Cultural Resources Investigation: Two Alternative Alignments for a Section 205 Water Control Project in Sherburne County, Minnesota -- Cantlin, Diann, Little Diann, Helene, and Elk Lakes
Author(s): L.L. Sikkink
Year: 1987
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I Cultural Resources Investigation: Two Alternative Alignments for a Section 205 Water Control Project in Sherburne County, Minnesota -- Cantlin, Diann, Little Diann, Helene, and Elk Lakes. L.L. Sikkink. 1987 ( tDAR id: 243293)
Keywords
Investigation Types
Reconnaissance / Survey
Geographic Keywords
27141 (Fips Code)
•
Baldwin Twp.
•
Minnesota (State / Territory)
•
North America (Continent)
•
Sherburne (County)
•
United States of America (Country)
Spatial Coverage
min long: -94.15; min lat: 45.246 ; max long: -93.51; max lat: 45.56 ;
Individual & Institutional Roles
Sponsor(s): U.S. Army Corps of Engineers
Prepared By(s): U.S. Army Corps of Engineers
Record Identifiers
NADB document id number(s): 3103061
NADB citation id number(s): 000000268023
Notes
General Note: Sent from: Us Army Corps of Engineers