Phase II Investigations at Contractor Furnished Borrow Area #1 and Other Proposed (But Not Yet Submitted) Borrow Areas Associated with Reconstruction of U.S. Highway 169 Between Paola and Osawatomie in Central Miami County, Project Number 169-61 K-7141-01

Author(s): Timothy Weston

Year: 2001

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase II Investigations at Contractor Furnished Borrow Area #1 and Other Proposed (But Not Yet Submitted) Borrow Areas Associated with Reconstruction of U.S. Highway 169 Between Paola and Osawatomie in Central Miami County, Project Number 169-61 K-7141-01. Timothy Weston. 2001 ( tDAR id: 251019)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -95.066; min lat: 38.389 ; max long: -94.609; max lat: 38.739 ;

Individual & Institutional Roles

Sponsor(s): KDOT

Prepared By(s): Archeology Office, KSHS, Topeka

Record Identifiers

NADB document id number(s): 670878

NADB citation id number(s): 000000269194

Notes

General Note: Sent from: Archeology Office, KSHS, Topeka

General Note: Submitted to: KDOT