Archaeological Mitigation of the US Army Signal Corps Stable Guard House, Crematory & Water Purification Plant (Bldg 268) and Associated Garbage Dumps and Burn Piles Uncovered During Construction of Eisenhower Hall at Fort Leavenworth, Kansas

Author(s): Berkley B. Bailey

Year: 1993

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Archaeological Mitigation of the US Army Signal Corps Stable Guard House, Crematory & Water Purification Plant (Bldg 268) and Associated Garbage Dumps and Burn Piles Uncovered During Construction of Eisenhower Hall at Fort Leavenworth, Kansas. Berkley B. Bailey. 1993 ( tDAR id: 251699)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -95.188; min lat: 38.954 ; max long: -94.776; max lat: 39.419 ;

Record Identifiers

NADB document id number(s): 670940

NADB citation id number(s): 000000269234

Notes

General Note: Sent from: Dept of Anthro, OU, Norman

General Note: Submitted to: USACE, KC Dist, DACA41-93-P-0175. Copies available from Kansas SHPO, Topeka