Class I Records Search & Field Survey for 3 Minor Cajon Pipeline Project Alterations: City of Adelanto Realignment, Baldy Mesa Realignment & Cajon / Eptc Pipeline Connection at Etiwanda Station, Rancho Cucamonga, CA
Author(s): Shelley Marie Owen
Year: 1995
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Class I Records Search & Field Survey for 3 Minor Cajon Pipeline Project Alterations: City of Adelanto Realignment, Baldy Mesa Realignment & Cajon / Eptc Pipeline Connection at Etiwanda Station, Rancho Cucamonga, CA. Shelley Marie Owen. 1995 ( tDAR id: 261510)
Keywords
Investigation Types
Site Evaluation / Testing
Geographic Keywords
06071 (Fips Code)
•
1.5 MILES X 120'
•
Adelanto
•
California (State / Territory)
•
Intermontane Valley
•
Mojave Desert
•
NO RESOURCES
•
North America (Continent)
•
San Bernardino (County)
•
San Bernardino Valley
•
United States of America (Country)
•
USGS Adelanto 7.5' quad
•
USGS Baldy Mesa 7.5' quad
•
USGS Guasti 7.5' quad
Spatial Coverage
min long: -117.803; min lat: 33.871 ; max long: -114.131; max lat: 35.809 ;
Individual & Institutional Roles
Sponsor(s): Bureau of Land Management; Cajon Pipeline Co. Ltd
Prepared By(s): EIP Associates
Record Identifiers
NADB document id number(s): 1063023
NADB citation id number(s): 000000254814
Notes
General Note: Submitted to: Cajon Pipeline Co. Ltd
General Note: Sent from: Eip Associates