Phase I Archaeological Survey for Trunk Highway 53 Realignment and Bridge Replacement Near the Town of Cotton, St. Louis County, Minnesota

Author(s): F. Florin

Year: 2001

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Archaeological Survey for Trunk Highway 53 Realignment and Bridge Replacement Near the Town of Cotton, St. Louis County, Minnesota. F. Florin. 2001 ( tDAR id: 267418)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -97.239; min lat: 43.499 ; max long: -89.483; max lat: 49.384 ;

Record Identifiers

NADB document id number(s): 3102856

NADB citation id number(s): 000000267808

Notes

General Note: Submitted to: Minnesota Department of Transportation [MN]

General Note: Sent from: Florin Cultural Resource Services