Archaeological Survey of Proposed Reconstruction of Four Miles of Highway 115 and Widening of a Bridge Over West Cache Creek, South of Cache, Comanche County, Oklahoma
Author(s): Tom Parry
Year: 1998
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Archaeological Survey of Proposed Reconstruction of Four Miles of Highway 115 and Widening of a Bridge Over West Cache Creek, South of Cache, Comanche County, Oklahoma. Tom Parry. 1998 ( tDAR id: 269076)
Keywords
Investigation Types
Reconnaissance / Survey
General
Road Construction
Geographic Keywords
40031 (Fips Code)
•
Comanche (County)
•
North America (Continent)
•
Oklahoma (State / Territory)
•
United States of America (Country)
Spatial Coverage
min long: -98.826; min lat: 34.406 ; max long: -98.089; max lat: 34.856 ;
Record Identifiers
NADB document id number(s): 803959
NADB citation id number(s): 000000262929
Notes
General Note: Sent from: BIA
General Note: Contract number: 4 Miles of SH115
General Note: Submitted to: BIA