Oxy USA Inc., Proposal for Greenwood Booster #6 Compressor Site, the Greenwood Booster #3 South Loop Pipeline & the Santa Fe E-1 Tie-In Pipeline in Morton Co. (CR-12-1384)

Author(s): James M. Brechtel

Year: 1998

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Oxy USA Inc., Proposal for Greenwood Booster #6 Compressor Site, the Greenwood Booster #3 South Loop Pipeline & the Santa Fe E-1 Tie-In Pipeline in Morton Co. (CR-12-1384). James M. Brechtel. 1998 ( tDAR id: 282391)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -102.042; min lat: 36.993 ; max long: -101.555; max lat: 37.389 ;

Individual & Institutional Roles

Sponsor(s): USDA Forest Service

Prepared By(s): James M. Brechtel, Consulting Archaeologist, Fort Collins, Colorado

Record Identifiers

NADB document id number(s): 672646

NADB citation id number(s): 000000271479

Notes

General Note: Sent from: James M. Brechtel, Consulting Archaeologist, Fort Collins, Colorado

General Note: Submitted to: USDA Forest Service