Phase 1 Archaeological Survey for the Clarksville to Chambers Spring 345-KV Transmission Line, Clarksville to Boudinot Substation, Wagoner and Cherokee Counties, Oklahoma.
Author(s): Annie Moerbe
Year: 1998
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase 1 Archaeological Survey for the Clarksville to Chambers Spring 345-KV Transmission Line, Clarksville to Boudinot Substation, Wagoner and Cherokee Counties, Oklahoma.. Annie Moerbe. 1998 ( tDAR id: 294705)
Keywords
Site Type
Rock Shelter
Investigation Types
Reconnaissance / Survey
General
34CK385-400, 34WG224-227
•
Farmstead
•
Lithic Scatter
Geographic Keywords
40021 (Fips Code)
•
40145 (Fips Code)
•
Cherokee (County)
•
North America (Continent)
•
Oklahoma (State / Territory)
•
United States of America (Country)
•
Wagoner (County)
Temporal Keywords
eastern woodland
•
Historic (1900-present)
•
Late Archaic
•
Plains Village
•
Prehistoric
Spatial Coverage
min long: -95.82; min lat: 35.638 ; max long: -94.797; max lat: 36.163 ;
Record Identifiers
NADB document id number(s): 804424
NADB citation id number(s): 000000263393
Notes
General Note: Contract number: Clarksville to Boudinot 345kV
General Note: Sent from: Burns & McDonnell
General Note: Submitted to: REA