Cultural Resource Reconnaissance of the Proposed Texas Mountain Prescribed Fire Control Line and Stock Trail, Rio Blanco County, Co.
Author(s): Michael Selle
Year: 1995
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resource Reconnaissance of the Proposed Texas Mountain Prescribed Fire Control Line and Stock Trail, Rio Blanco County, Co.. Michael Selle. 1995 ( tDAR id: 311197)
Keywords
Investigation Types
Site Evaluation / Testing
•
Systematic Survey
Geographic Keywords
08103 (Fips Code)
•
Colorado (State / Territory)
•
North America (Continent)
•
Rio Blanco (County)
•
United States of America (Country)
Spatial Coverage
min long: -109.051; min lat: 39.65 ; max long: -107.037; max lat: 40.226 ;
Individual & Institutional Roles
Prepared By(s): BLM White River Resource Area
Record Identifiers
NADB document id number(s): 624187
NADB citation id number(s): 000000352339
Notes
General Note: Sent from: BLM White River Resource Area