Report On the 1979 Li Near Archeological Survey of Three Powerline Right-Of-Ways and for Improvements On County Road 189 1 / 2, in Conjunction With Rocky Mountain Energy Company's Copper Mountain Development Project

Author(s): Timothy Burchett

Year: 1980

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Report On the 1979 Li Near Archeological Survey of Three Powerline Right-Of-Ways and for Improvements On County Road 189 1 / 2, in Conjunction With Rocky Mountain Energy Company's Copper Mountain Development Project. Timothy Burchett. 1980 ( tDAR id: 31208)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -110.054; min lat: 42.261 ; max long: -107.501; max lat: 44.009 ;

Individual & Institutional Roles

Sponsor(s): Bureau of Land Management; Rocky Mountain Energy Company, Unknow Location

Prepared By(s): Powers Elevation, Eagle, Co

Record Identifiers

NADB document id number(s): 904393

NADB citation id number(s): 000000115706

Notes

General Note: Sent from: Powers Elevation, Eagle, Co

General Note: Submitted to: Rocky Mountain Energy Company, Unknow Location