Supplemental Phase I Archaeological Survey for Proposed Bridge Replacement Project, BROS-CO53(42)--5F-53; FHWA No. 206270, Jones County, Iowa

Author(s): Derrick J. Marcucci

Year: 2002

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Supplemental Phase I Archaeological Survey for Proposed Bridge Replacement Project, BROS-CO53(42)--5F-53; FHWA No. 206270, Jones County, Iowa. Derrick J. Marcucci. Landmark Archaeology, Inc. Reports ,1. Altamont, NY: Landmark Archaeology, Inc. 2002 ( tDAR id: 312336)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -91.366; min lat: 41.946 ; max long: -90.898; max lat: 42.296 ;

Individual & Institutional Roles

Sponsor(s): Federal Highway Administration

Record Identifiers

NADB document id number(s): 649274

NADB citation id number(s): 000000315001