Supplemental Phase I Archaeological Survey for Proposed Bridge Replacement Project, BROS-CO53(42)--5F-53; FHWA No. 206270, Jones County, Iowa
Author(s): Derrick J. Marcucci
Year: 2002
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Supplemental Phase I Archaeological Survey for Proposed Bridge Replacement Project, BROS-CO53(42)--5F-53; FHWA No. 206270, Jones County, Iowa. Derrick J. Marcucci. Landmark Archaeology, Inc. Reports ,1. Altamont, NY: Landmark Archaeology, Inc. 2002 ( tDAR id: 312336)
Keywords
Investigation Types
Archaeological Overview
Spatial Coverage
min long: -91.366; min lat: 41.946 ; max long: -90.898; max lat: 42.296 ;
Individual & Institutional Roles
Sponsor(s): Federal Highway Administration
Record Identifiers
NADB document id number(s): 649274
NADB citation id number(s): 000000315001