Phase I Archaeological Investigations of Tasler Bridge (BROS-CO40[18]-5F-40, Fwha 172439) and Grading and Railroad Overhead (FM-CO40[40]-55-40, Fwha 171890 and Grading, Hamilton County, Iowa
Author(s): Adam J. Meseke; Charles K. Benton; Joseph A. Tiffany
Year: 2001
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase I Archaeological Investigations of Tasler Bridge (BROS-CO40[18]-5F-40, Fwha 172439) and Grading and Railroad Overhead (FM-CO40[40]-55-40, Fwha 171890 and Grading, Hamilton County, Iowa. Adam J. Meseke, Charles K. Benton, Joseph A. Tiffany. Project Report ,1. Ames, IA: Isual. 2001 ( tDAR id: 312553)
Keywords
Investigation Types
Archaeological Overview
General
Bridge Replacements
•
Gradings
•
Historic Foundations
Geographic Keywords
19079 (Fips Code)
•
Hamilton (County)
•
Hamilton County
•
Iowa (State / Territory)
•
North America (Continent)
•
Railroad Overhead
•
Tasler Bridge
•
United States of America (Country)
•
Webster City
Spatial Coverage
min long: -93.972; min lat: 42.209 ; max long: -93.463; max lat: 42.558 ;
Individual & Institutional Roles
Sponsor(s): Federal Highway Administration
Record Identifiers
NADB document id number(s): 649360
NADB citation id number(s): 000000315088