A Phase II Assessment Survey of 33 Kn 390 and 33 Kn 393 for the Proposed Beckley Road Realignment and Bridge Replacement Kno-Tr401-2. 78, in Morris Township, Knox County, Ohio

Author(s): Christopher Jackson; Dawn Herr; Brent Campagna

Year: 1996

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

A Phase II Assessment Survey of 33 Kn 390 and 33 Kn 393 for the Proposed Beckley Road Realignment and Bridge Replacement Kno-Tr401-2. 78, in Morris Township, Knox County, Ohio. Christopher Jackson, Dawn Herr, Brent Campagna. 1996 ( tDAR id: 322433)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -82.751; min lat: 40.239 ; max long: -82.179; max lat: 40.573 ;

Individual & Institutional Roles

Sponsor(s): Department of Transportation

Record Identifiers

NADB document id number(s): 32457

NADB citation id number(s): 000000378419