Proposed Route 55 Freeway Right-Of-Way "S2" Alignment . Begins at Rt 40 Near Malaga,NJ and cont. to Rt 42 Near Runnemede for a distance of 20.5 miles. Cultural Resources Inventory

Author(s): James Boylan

Year: 1980

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Proposed Route 55 Freeway Right-Of-Way "S2" Alignment . Begins at Rt 40 Near Malaga,NJ and cont. to Rt 42 Near Runnemede for a distance of 20.5 miles. Cultural Resources Inventory. James Boylan. 1980 ( tDAR id: 332836)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -75.451; min lat: 39.515 ; max long: -74.877; max lat: 39.888 ;

Individual & Institutional Roles

Sponsor(s): NJ DOT

Prepared By(s): Envrionmental Assessment Council. Inc.

Record Identifiers

NADB document id number(s): 3001544

NADB citation id number(s): 000000372693

Notes

General Note: Sent from: Envrionmental Assessment Council. Inc.