Proposed Route 55 Freeway Right-Of-Way "S2" Alignment . Begins at Rt 40 Near Malaga,NJ and cont. to Rt 42 Near Runnemede for a distance of 20.5 miles. Cultural Resources Inventory
Author(s): James Boylan
Year: 1980
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Proposed Route 55 Freeway Right-Of-Way "S2" Alignment . Begins at Rt 40 Near Malaga,NJ and cont. to Rt 42 Near Runnemede for a distance of 20.5 miles. Cultural Resources Inventory. James Boylan. 1980 ( tDAR id: 332836)
Keywords
Investigation Types
Archaeological Overview
Spatial Coverage
min long: -75.451; min lat: 39.515 ; max long: -74.877; max lat: 39.888 ;
Individual & Institutional Roles
Sponsor(s): NJ DOT
Prepared By(s): Envrionmental Assessment Council. Inc.
Record Identifiers
NADB document id number(s): 3001544
NADB citation id number(s): 000000372693
Notes
General Note: Sent from: Envrionmental Assessment Council. Inc.