Cultural Resources Inventory Report on the Proposed BLM Crossing of the Haystack Mountain Powerline Upgrade Project in Summit County, Co. (Gri 9562)
Author(s): Carl E. Conner
Year: 1995
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resources Inventory Report on the Proposed BLM Crossing of the Haystack Mountain Powerline Upgrade Project in Summit County, Co. (Gri 9562). Carl E. Conner. 1995 ( tDAR id: 337765)
Keywords
Investigation Types
Reconnaissance / Survey
Geographic Keywords
08117 (Fips Code)
•
Colorado (State / Territory)
•
North America (Continent)
•
Summit (County)
•
United States of America (Country)
Spatial Coverage
min long: -106.44; min lat: 39.357 ; max long: -105.776; max lat: 39.925 ;
Individual & Institutional Roles
Prepared By(s): Grand River Institute for the BLM Grand Junction Resource Area
Record Identifiers
NADB document id number(s): 626033
NADB citation id number(s): 000000354115
Notes
General Note: Sent from: Grand River Institute for the BLM Grand Junction Resource Area