Cripple Creek & Victor Gold Mining Company Cresson Project Site Re-Evaluations Following Archaeological Excavation Treatment Carlton Permint Area 1 and 2 Water Pipeline Corridor (Resulting from Work Performed by Wcrm, Inc., 1993-1994)
Author(s): Unspecified
Year: 1998
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cripple Creek & Victor Gold Mining Company Cresson Project Site Re-Evaluations Following Archaeological Excavation Treatment Carlton Permint Area 1 and 2 Water Pipeline Corridor (Resulting from Work Performed by Wcrm, Inc., 1993-1994). Unspecified. 1998 ( tDAR id: 338159)
Keywords
Investigation Types
Data Recovery / Excavation
Geographic Keywords
08119 (Fips Code)
•
Colorado (State / Territory)
•
North America (Continent)
•
Teller (County)
•
United States of America (Country)
Spatial Coverage
min long: -105.331; min lat: 38.648 ; max long: -104.939; max lat: 39.13 ;
Individual & Institutional Roles
Prepared By(s): Paragon Archaeological Consultants, Inc. for BLM Canon City District
Record Identifiers
NADB document id number(s): 626219
NADB citation id number(s): 000000354359
Notes
General Note: Sent from: Paragon Archaeological Consultants, Inc. for BLM Canon City District