Cultural Resource Monitoring Results Report for the East Mission Gorge Interceptor Sewer System Force Main Construction Project
Author(s): Carolyn Kyle; Dennis Gallegos
Year: 1993
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Cultural Resource Monitoring Results Report for the East Mission Gorge Interceptor Sewer System Force Main Construction Project. Carolyn Kyle, Dennis Gallegos. 1993 ( tDAR id: 342072)
Keywords
Spatial Coverage
min long: -117.611; min lat: 32.529 ; max long: -116.081; max lat: 33.505 ;
Individual & Institutional Roles
Sponsor(s): Pcl Civil Construction, Inc.
Prepared By(s): Gallegos and Associates
Record Identifiers
NADB document id number(s): 1122853
NADB citation id number(s): 000000313716
Notes
General Note: Contract number: 88-0089
General Note: Sent from: Gallegos and Associates
General Note: Submitted to: Pcl Civil Construction, Inc.