Phase III Assessment Testing of Sites 33Fa240, 241 and 247 Within the Proposed State Route 256 Roadway Improvement Project in Violet Township, Fairfield County, Ohio
Author(s): David R. Bush; Judith E. Thomas; Mark A. Kollecker; Michael A. Simons; Renea M. Martello
Year: 1991
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase III Assessment Testing of Sites 33Fa240, 241 and 247 Within the Proposed State Route 256 Roadway Improvement Project in Violet Township, Fairfield County, Ohio. David R. Bush, Judith E. Thomas, Mark A. Kollecker, Michael A. Simons, Renea M. Martello. 1991 ( tDAR id: 34844)
Keywords
Geographic Keywords
39045 (Fips Code)
•
Fairfield (County)
•
North America (Continent)
•
Ohio (State / Territory)
•
United States of America (Country)
•
Violet Township
Spatial Coverage
min long: -82.843; min lat: 39.554 ; max long: -82.366; max lat: 39.941 ;
Individual & Institutional Roles
Sponsor(s): URS Consultants, Columbus, OH
Prepared By(s): David R. Bush, Inc.
Record Identifiers
NADB document id number(s): 31137
NADB citation id number(s): 000000144734
Notes
General Note: Submitted to: URS Consultants, Columbus, OH
General Note: Sent from: David R. Bush, Inc.