Phase I Archeological Survey for Added Row Widening for Bridge Replacement Br0S-9077(5)-5F-77 on Four Mile Creek IN Polk County, Iowa, Sections 1 and 12, T80N, R24W

Author(s): R. Lee McNair

Year: 1990

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Archeological Survey for Added Row Widening for Bridge Replacement Br0S-9077(5)-5F-77 on Four Mile Creek IN Polk County, Iowa, Sections 1 and 12, T80N, R24W. R. Lee McNair. 1990 ( tDAR id: 349700)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -93.816; min lat: 41.482 ; max long: -93.328; max lat: 41.863 ;

Individual & Institutional Roles

Sponsor(s): Federal Highway Administration; Iowa Department of Transportation, Ames, IA

Prepared By(s): R. Lee McNair, Boone, IA

Record Identifiers

NADB document id number(s): 644605

NADB citation id number(s): 000000310281

Notes

General Note: Sent from: R. Lee McNair, Boone, IA

General Note: Submitted to: Iowa Department of Transportation, Ames, IA