A Phase I Archaeological Survey Od Local Systemsproject BROS-9077(34)--8J-77. A.K.A. FHWA 282940, Polk County
Author(s): John G. Hedden
Year: 1993
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
A Phase I Archaeological Survey Od Local Systemsproject BROS-9077(34)--8J-77. A.K.A. FHWA 282940, Polk County. John G. Hedden. Project Completion Report ,16-1. Iowa City, IA: Highway Archaeology Program. 1993 ( tDAR id: 350002)
Keywords
Investigation Types
Site Evaluation / Testing
Geographic Keywords
19153 (Fips Code)
•
Des Moines Lobe
•
Des Moines River Basin
•
Iowa (State / Territory)
•
North America (Continent)
•
Polk (County)
•
United States of America (Country)
Spatial Coverage
min long: -93.816; min lat: 41.482 ; max long: -93.328; max lat: 41.863 ;
Individual & Institutional Roles
Sponsor(s): Federal Highway Administration
Record Identifiers
NADB document id number(s): 645183
NADB citation id number(s): 000000310407