Phase I Archaeological Survey of the Proposed Bridge Replacement and Creek Rechannelization Project BROS-38(18)--85-38 IN T78N-R16W, Grundy County

Author(s): Richard L. Fishel

Year: 1993

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Archaeological Survey of the Proposed Bridge Replacement and Creek Rechannelization Project BROS-38(18)--85-38 IN T78N-R16W, Grundy County. Richard L. Fishel. Contract Completion Report ,1. Iowa City, IA: Office of the State Archaeologist. 1993 ( tDAR id: 350462)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -93.027; min lat: 42.209 ; max long: -92.534; max lat: 42.557 ;

Individual & Institutional Roles

Sponsor(s): Federal Highway Administration

Record Identifiers

NADB document id number(s): 644852

NADB citation id number(s): 000000310576