Phase I Cultural Resoureces Investigation of the Finderne Property, Green Brook Flood Control Project, Bridgewater Township, Somerset County, New Jersey (Draft report)

Author(s): Edward V. Curtin; Kerry Nelson

Year: 2002

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Cultural Resoureces Investigation of the Finderne Property, Green Brook Flood Control Project, Bridgewater Township, Somerset County, New Jersey (Draft report). Edward V. Curtin, Kerry Nelson. 2002 ( tDAR id: 356280)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -74.798; min lat: 40.374 ; max long: -74.402; max lat: 40.758 ;

Individual & Institutional Roles

Sponsor(s): U.S. Army Corps of Engineers

Prepared By(s): PANAMERICAN CONSULTANTS, INC.

Record Identifiers

NADB document id number(s): 3000282

NADB citation id number(s): 000000371307

Notes

General Note: Sent from: PANAMERICAN CONSULTANTS, INC.