Preliminary State on Additional Geomorphological / Archaeological Evaluation of Phase 7, Segment 4, Area B of the Proposed Des Moines Ica Intercepter Sewer Routes

Author(s): R. Peter Winham; Mark Johnson

Year: 1992

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Preliminary State on Additional Geomorphological / Archaeological Evaluation of Phase 7, Segment 4, Area B of the Proposed Des Moines Ica Intercepter Sewer Routes. R. Peter Winham, Mark Johnson. 1992 ( tDAR id: 363819)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -93.816; min lat: 41.482 ; max long: -93.328; max lat: 41.863 ;

Record Identifiers

NADB document id number(s): 648852

NADB citation id number(s): 000000314574

Notes

General Note: Submitted to: City Engineering, Des Moines, IA

General Note: Sent from: The Arch Laboratory, Augustana College, Sioux Falls, SD