Phase I Cultural Resource Survey for the Proposed Buffalo Creek Bridge Replacement and Realignment Project on County Road W45 IN Byron and Fremont Townships, Buchanan County, Iowa.

Author(s): Jeff Straka; David Stanley

Year: 2001

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Phase I Cultural Resource Survey for the Proposed Buffalo Creek Bridge Replacement and Realignment Project on County Road W45 IN Byron and Fremont Townships, Buchanan County, Iowa.. Jeff Straka, David Stanley. BCA Reports ,1. Cresco, Iowa: Bear Creek Archeology, Inc. 2001 ( tDAR id: 363909)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -92.082; min lat: 42.296 ; max long: -91.597; max lat: 42.644 ;

Individual & Institutional Roles

Sponsor(s): Federal Highway Administration

Record Identifiers

NADB document id number(s): 649002

NADB citation id number(s): 000000314714