Cultural Resource Assessment Proposed Millard Canyon Surface Water Treatment Facilities and Pipeline Replacement Project Located in Cabazon Area of Riverside County

Author(s): Steve Moffitt

Year: 1993

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

Cultural Resource Assessment Proposed Millard Canyon Surface Water Treatment Facilities and Pipeline Replacement Project Located in Cabazon Area of Riverside County. Steve Moffitt. 1993 ( tDAR id: 38308)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -117.676; min lat: 33.426 ; max long: -114.435; max lat: 34.08 ;

Individual & Institutional Roles

Prepared By(s): Archaeological Research Unit

Record Identifiers

NADB document id number(s): 1084303

NADB citation id number(s): 000000140126

Notes

General Note: Submitted to: Private

General Note: Contract number: ARU #1213

General Note: Sent from: Archaeological Research Unit