This report documents work completed by the Williamsport Preservation Training Center (WPTC) on the Band Barracks, Building #646, Fort Sam Houston, Texas. The objectives of the project were to restore the porch and cornice as part of an ongoing restoration project.

All items identified in the task directive were completed with the exception of repairs and painting of the west elevation cornice; installation and painting of the grill work for the verandas, and installation and painting of the lattice below the first level veranda. Included in the work were four design changes that either changed how work was done and/or added work to the project.

Cite this Record

Record of Treatment for Band Building 646 Restoration, Phases I and II, Fort Sam Houston, San Antonio, Texas. Gary H. Glidewell. 1994 ( tDAR id: 405455) ; doi:10.48512/XCV8405455

Keywords

Spatial Coverage

min long: -98.51; min lat: 29.425 ; max long: -98.357; max lat: 29.545 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Project Director(s): Gary H. Gildwell

Repository(s): Fort Sam Houston

Prepared By(s): Williamsport Preservation Training Center, National Park Service

Record Identifiers

Work Order Number(s): 1155-0094-454

File Information

  Name Size Creation Date Date Uploaded Access
19940329-FSH-Band-Bldg-646-Restoration-Records.pdf 104.16mb Apr 27, 2016 7:18:57 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio