BLM Memorandum: Results of Cultural Resource Investigation, Level 1, of the Proposed Right-Of-Way for Electric Power Line, Natrona County, WY

Author(s): Daniel J. Hutchinson

Year: 1976

Summary

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.

If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.

Cite this Record

BLM Memorandum: Results of Cultural Resource Investigation, Level 1, of the Proposed Right-Of-Way for Electric Power Line, Natrona County, WY. Daniel J. Hutchinson. 1976 ( tDAR id: 41005)

This Resource is Part of the Following Collections

Spatial Coverage

min long: -107.544; min lat: 42.43 ; max long: -106.071; max lat: 43.502 ;

Record Identifiers

NADB document id number(s): 900055

NADB citation id number(s): 000000111368

Notes

General Note: Sent from: BLM, Casper District Office, Casper, WY

General Note: Submitted to: BLM, Platte River Resource Area, Mills, WY