Mitigation For the Western Area Power Administration Curecanti-Blue Mesa-Salida 115 Kv Transmission Line Access Roads Rehabilitation Project (BLM-Gbra 93Gn027)
Author(s): M. Clark Pope
Year: 1994
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Mitigation For the Western Area Power Administration Curecanti-Blue Mesa-Salida 115 Kv Transmission Line Access Roads Rehabilitation Project (BLM-Gbra 93Gn027). M. Clark Pope. 1994 ( tDAR id: 41855)
Keywords
Investigation Types
Data Recovery / Excavation
General
Mitigation
•
Rehabilitation Project
•
Transmission Line
Spatial Coverage
min long: -107.635; min lat: 37.748 ; max long: -105.429; max lat: 39.258 ;
Individual & Institutional Roles
Sponsor(s): Department of Energy
Prepared By(s): Alpine Archaeological Consultants, Inc.
Record Identifiers
NADB document id number(s): 5308005
NADB citation id number(s): 000000176033
Notes
General Note: Submitted to: Department of Energy
General Note: Sent from: Alpine Archaeological Consultants, Inc.