A Cultural Resources Survey of the Salt River Project Fence Lake Coal Mine Transportation Corridor Reroute 4 Near the Coronado Generating Station in Apache County, Arizona

Author(s): Lynn A. Neal

Year: 1995

Summary

Salt River Project (SRP) proposes to construct a railroad transportation corridor from the proposed Fence Lake Coal Mine in Catron County, New Mexico, to the Coronado Generating Station in Apache County, Arizona. The original route of the Arizona corridor was surveyed by O’Brien and Dosh (1987). The New Mexico portion of the corridor and two reroutes along the New Mexico segment were inventoried in 1991 (Morris 1992). A third reroute, also on the New Mexico corridor, was inventoried in 1994 (Gilpin and Anduze 1994). Traditional cultural properties were addressed for the entire Fence Lake project area in Hart and Ferguson (1993). The inventory reported herein was for a fourth proposed reroute, a corridor 1.1 miles (5808 feet) long and 200 feet wide. The direct impact zone is 150 feet wide with a 50-foot-wide buffer zone on the north side. A fence line marks the corridor's southern boundary. The U.S. Department of the Interior (USDI), Office of Surface Mining, is the overall lead agency for the Fence Lake Coal Mine Project and the USDI, Bureau of Land Management, Las Cruces District, Socorro Resource Area, is the lead agency for cultural resources.

Cite this Record

A Cultural Resources Survey of the Salt River Project Fence Lake Coal Mine Transportation Corridor Reroute 4 Near the Coronado Generating Station in Apache County, Arizona. Lynn A. Neal. 1995 ( tDAR id: 426394) ; doi:10.6067/XCV8426394

This Resource is Part of the Following Collections

Spatial Coverage

min long: -109.473; min lat: 34.371 ; max long: -109.065; max lat: 34.6 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Principal Investigator(s): David H. Greenwald

Sponsor(s): Salt River Project

Permitting Agency(s): Bureau of Land Management Las Cruces District Socorro Resource Area

Repository(s): Salt River Project, Tempe, AZ

Prepared By(s): SWCA Environmental Consultants

Submitted To(s): Salt River Project

Record Identifiers

SWCA Project No.(s): 23-94865-5

SWCA Archaeological Report No.(s): 95-6

Notes

General Note: Final Report

File Information

  Name Size Creation Date Date Uploaded Access
1995_Neal_ACulturalReroute4_OCR_PDFA.pdf 4.99mb Jun 2, 1995 Nov 23, 2016 1:11:19 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager