A Cultural Resource Survey of the Salt River Project Proposed Realignment of the Saguaro Marina 12kV Distribution Line, Saguaro Lake, Maricopa County, Arizona

Author(s): John T. Marshall

Year: 1995

Summary

This report summarizes the results of a Class III records search and cultural resources survey of the right-of-way for the realignment of a 12 kV distribution line on the west side of Saguaro Lake, beginning at the marina.

Cite this Record

A Cultural Resource Survey of the Salt River Project Proposed Realignment of the Saguaro Marina 12kV Distribution Line, Saguaro Lake, Maricopa County, Arizona. John T. Marshall. 1995 ( tDAR id: 427835) ; doi:10.6067/XCV8427835

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.546; min lat: 33.553 ; max long: -111.529; max lat: 33.583 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Prepared By(s): Northland Research, Inc.

Submitted To(s): Salt River Project

Record Identifiers

SRP Library Barcode No.(s): 00091122

File Information

  Name Size Creation Date Date Uploaded Access
1995_Marshall_ACulturalResource_OCR_PDFA.pdf 2.47mb Mar 23, 1995 Mar 9, 2017 3:39:37 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager