Response from James Bruseth and Timothy Perttula to William Fickel, Camp Bullis Cultural Resource Management Plan, Fort Sam Houston, Texas
Author(s): James E. Bruseth; Timothy K. Perttula
Year: 1994
Summary
The Planning Division at Fort Worth, Texas, sent a draft of the Cultural Resource Management Plan to the Texas Historical Commission for review. The Commission believes that this document should be revised in accordance with enclosed recommendations to clarify issues and major topics.
Cite this Record
Response from James Bruseth and Timothy Perttula to William Fickel, Camp Bullis Cultural Resource Management Plan, Fort Sam Houston, Texas. James E. Bruseth, Timothy K. Perttula. 1994 ( tDAR id: 433661) ; doi:10.48512/XCV8433661
Keywords
Investigation Types
Heritage Management
•
Research Design / Data Recovery Plan
General
CRMP
Geographic Keywords
Camp Bullis
•
JBSA-Sam Houston
•
Texas
Spatial Coverage
min long: -98.718; min lat: 29.547 ; max long: -98.385; max lat: 29.912 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
Repository(s): Fort Sam Houston
Prepared By(s): Department of Antiquities Protection, Texas Historical Commission
Submitted To(s): Planning Division, Fort Worth
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
19940202-To-FWCE-SHPO-CB-CRMP_Letter-1.pdf | 173.20kb | Jan 10, 2018 6:59:35 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cultural Resource Office, Joint Base San Antonio