Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Pending Environmental Assessment of Proposed Access Control Measures, Fort Sam Houston, Texas
Author(s): F. Lawrence Oaks
Year: 2003
Summary
The Texas Historical Commission has received correspondence from Fort Sam Houston describing the pending environmental assessment of proposed access control measures. This letter serves as comment on the proposed undertaking from the State Historic Preservation Officer, the Executive Director of the Texas Historical Commission.
Copied to this correspondence is Ann McClone (City of San Antonio Preservation Office), Joan Gaither (Society for the Preservation of Historic Fort Sam Houston), Jill harrison Souter (San Antonio Conservation Society) and Virginia S. Nicholas (Bexar County Historical Commission).
Cite this Record
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Pending Environmental Assessment of Proposed Access Control Measures, Fort Sam Houston, Texas. F. Lawrence Oaks. 2003 ( tDAR id: 435950) ; doi:10.48512/XCV8435950
Keywords
Investigation Types
Heritage Management
•
Research Design / Data Recovery Plan
Geographic Keywords
Bexar (County)
•
JBSA-Sam Houston
•
San Antonio
•
Texas
Spatial Coverage
min long: -98.471; min lat: 29.453 ; max long: -98.404; max lat: 29.478 ;
Individual & Institutional Roles
Contact(s): Cultural Resource Office, Joint Base San Antonio
Repository(s): Fort Sam Houston
Prepared By(s): Texas Historical Commission
Submitted To(s): Department of the Army, Fort Sam Houston
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
20031016-To-FSH-SHPO-Access-Control-Measures.pdf | 467.64kb | May 22, 2017 8:51:40 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Cultural Resource Office, Joint Base San Antonio